Aug
31
2009
UPDATE
BEACH NOURISHMENT
August 31, 2009
Beach nourishment operations have been resumed; it is a 24/7 operation. The sand is conveyed via a pipeline which extends from the dredge in Corson’s Inlet to the area of the fill, currently approaching 43rd Street. The pipe will eventually extend all the way to 52nd Street.
Continue Reading »
Aug
28
2009
UPDATE
BEACH NOURISHMENT
August 27, 2009
Beach nourishment operations have been suspended due to an equipment failure. Once the equipment has been restored, pumping operations will resume. Due to the impending tropical storm Danny, it is likely that pumping operations will once again be suspended; the duration of the suspension will be dependent on the severity and length of the storm.
Continue Reading »